Permit-Ready Solar Plan Sets
Sunrise PTO delivers AHJ-aligned, code-compliant solar plan sets for residential and commercial installations
across all 50 U.S. states built for speed, built to pass.
Solar Plan Sets Built for Your Installation Workflow
Sunrise PTO supports solar installers and EPC teams with coordinated plan sets for residential and commercial projects. We turn project information into drawings that communicate the proposed system layout, equipment, electrical connections, and mounting details for permit review.
Project-Specific Documentation
Permit requirements vary by jurisdiction, utility, and system configuration. Our preparation process accounts for applicable setbacks, equipment specifications, electrical requirements, and structural documentation needs, including battery storage where relevant.
Support Through Plan Review
When an AHJ requests clarification or corrections, we review the comments and coordinate the necessary drawing updates. This helps your team manage submissions while staying focused on installations and project delivery.
Everything in one package
Each plan set is complete out of the box.No missing sheets, no chasing documents, no surprises at the permit counter.
Cover sheet with full project data
Site Plan with setbacks & Equipment placement
Roof Layout with module spacing
String Layout and inverter mapping
Single Line & Three line Diagrams
Structural mounting details
NEC – Compliant labeling
Load calculations & engineering notes
Commonly Asked Questions
Are your plan sets truly permit-ready?
Yes. Every plan set is aligned with the AHJ’s specific requirements, NEC standards, and utility interconnection guidelines before delivery – minimizing rejections and getting you to approval faster.
Do you adapt plans for different jurisdictions?
Every plan set is individually adjusted to local setbacks, fire codes, utility rules, and any state-specific amendments. We cover 49+ states and track local code changes continuously.
What if the AHJ requests revisions?
We respond quickly with updated drawings and clarification letters to protect your timeline. Revision support for AHJ feedback is included.
Can you design for battery storage?
Yes. We calculate breaker sizing, backfeed limits, and system compatibility for safe battery integration, whether AC-coupled or DC-coupled.
How do you minimize AHJ correction notices?
Before finalizing, our engineers review voltage drop, conductor sizing, labeling accuracy, structural criteria, and local amendments. Most issues are caught and resolved internally before submission.
Accurate Designs. Faster Approvals.
Get in touch today for fast and reliable solar design support.
