Two critical approvals stand between your installed system and a live, grid-connected solar array. Sunrise PTO manages the entire process, from interconnection agreement to final PTO – so nothing falls through the cracks.
Getting a solar system from installed to fully operational requires two separate utility approvals – and both have to be done right.
First comes the interconnection agreement – the utility’s formal authorization to connect your solar system to the grid.
Then comes Permission to Operate (PTO) – the final clearance to turn the system on and start exporting power.Miss a step, submit the wrong form, or leave a field incomplete, and your project stalls at the finish line. Sunrise PTO handles both processes end to end, ensuring accurate submissions, proactive follow-ups, and faster approvals – for residential and commercial projects across all 50 U.S. states.
Checking all project documentation before submission to catch issues early.
Building a complete, utility-specific PTO application package.
Submitting accurately to the right utility contact, the right way.
Proactive communication with the corresponding utilities to keep your application moving.
Daily monitoring so you always know where your project stands.
If the utility requests changes, we respond and resubmit fast.
Your customer gets the green light to flip the switch.
Every day a system sits inactive after installation is a day your customer isn’t saving money u2014 and a day your business isn’t getting paid. PTO delays are one of the most common reasons solar projects stall at the final stage, and they’re almost always caused by the same avoidable issues:
Sunrise PTO eliminates these bottlenecks with a structured, accuracy-first process that reduces back-and-forth and gets utility approvals across the finish line.